与QAS或PRD的新连接

Basic Service with limited included service time for Connectivity

  • Provision SupplyOn parameter sheet for QAS and/or PRD environment (QAS...Quality Assurance System, PRD...productive Landscape)
  • Provision SupplyOn certificate(s) for QAS and/or PRD environment
  • One AS/2 or OFTP2 Partner configuration or update inclusive certificates and firewall settings on SupplyOn QAS and/or PRD EDI environment based on SupplyOn Integration guide and parameter sheet
  • Connection test and error handling
  • Handover to SupplyOn operations team
  • Language: English (French or German may be offered in some cases)
  • Exchange via ticket system or e-mail

Additional services or service time can be provided on time & material basis (excl. travel costs and travel times) upon a separate order.

Further informations:

您的连接
请提供使用的OFTP2或AS / 2标识符以及SupplyOn。
上传
允许的类型:pdf xlsx xls。 最多 3 个文件。
包含服务时间
9.00h
价格
€1,500.00